Make connections and install the new backplane, Backplane settings – ETC Sensor+ Touring Rack CEM+ to CEM3 Retrofit User Manual

Page 10

Advertising
background image

8

CEM3 Sensor+ Touring Rack Retrofit Manual

Backplane Settings

Upgrade kit backplanes ship from the factory with all DIP switches in the off (down) position.

You will have to set the DIP switches on the new backplane to match your rack. You will

also have to verify the termination switch settings.

a: Set both termination switches to “Off” (middle position).
b: Using a precision screwdriver, set the DIP switches to match your rack type

according to:

• number of dimmers (48 or 96)

• whether the rack has Advanced Features (AF)

Use the following chart to determine your required DIP switch settings:

“On” position = switch pushed to the top

Make Connections and Install the New Backplane

Step 1:

Bend one arm of the backplane metal in

towards the opposite arm (about 30 deg).

Bend the metal as little as possible to get it

inside the rack.

Step 2:

Insert the backplane metal at an angle.

Then straighten it once it is past the face of

the rack. Push it into the rack far enough

that it stays in place, but leave yourself

some room to make the power and data

connections.

DIP switch Number

Rack Model

1

2

3

4

5

6

7

8

SP+48

On

SP+48 AF

On

On

SP+96
SP+96 AF

On

“Double Small” +96
“Double Small” +96 AF

On

Set termination to “Off”

(middle position)

Set DIP switches

Top View

Advertising