The retrofit, Rack geography, Preparation – ETC Sensor+ Touring Rack CEM+ to CEM3 Retrofit User Manual

Page 7

Advertising
background image

2

The Retrofit

5

S e c t i o n 2

The Retrofit

Rack Geography

Throughout this manual directions are given which refer to the front, back, left, and right

sides of the rack. For clarification, these references are detailed below.

Front - face of the rack with the dimmer modules and CEM.

Back - face of the rack with output and control connections (VEAM, DMX).

Left - when facing the front of the rack, this is the side to your left.

Right - when facing the front of the rack, this is the side to your right.

Preparation

Step 1:

Turn off the main breaker and disconnect all of the Cam-Lok

®

connectors from

the touring rack.

Step 2:

Remove the top eight or more dimmer modules from the rack.

Step 3:

Use a digital voltmeter to VERIFY that power is off by checking voltages for all

combinations between the phase bars, neutral and ground.

Step 4:

Remove the CEM+ from the rack.

Step 5:

Remove the rack door in front of the CEM+

slot by pushing down on the tab in the top

hinged corner.

Step 6:

Remove the left side panel of the touring

rack (10 Phillips head screws) and set it

aside.

N o t e :

You may find it necessary to remove the right side panel as well, depending on

your preferred method of performing some of the following steps. Feel free to do

so as needed.

Remo

ve

1-

P

u

sh

2-

Re

move

Advertising