2 teach-in operation, 1 preparing device for teach-in operation, Teach-in operation – EUCHNER MGB (V2.0.0) User Manual

Page 5: Preparing device for teach-in operation, Mgb help for setup and service

Advertising
background image

MGB Help for Setup and Service

2 Teach-in operation

2.1 Preparing device for teach-in operation

 Connect the MGB as shown below, but do not apply any voltage to UB yet.

 Observe different control of guard locking for MGB-L1 and MGB-L2.

Note:

In case of AR configuration: For the teach-in standby state, FI1A and FI1B must be connected to DC 24 V.
Every MGB taught-in individually before a switch chain is set up.

115218-01-03/12

Subject to technical modifications

Page 5/14

Advertising