Flex TPO Для дома User Manual

Page 25

Advertising
background image

25

ACCESSORIES

Walkway Pads
Install walkway pads in those locations as designated in the specifications.
Thoroughly clean and prepare the area of the roof membrane that is to be
hot air welded to the walkway pad.

The Flex Walkway Pad is installed in maximum lengths of 10’. Position
sections of the walkway pad to leave a space between adjacent sheets
approximately 2” wide. Do not cover field seams with the Walkway Pad.
Position the pads to leave minimum 4” wide area exposed at the field
seams. Hot air weld all four sides of the walkway pad to the field
membrane.

Flex Walkway Pad

Advertising