Preparations 5.1. installation, Bath fluids – JULABO SL-26 Heating Circulators User Manual

Page 18

Advertising
background image

Preparations

18

5. Preparations

5.1. Installation

Heating circulators

 Place the unit on an even surface on a base made of nonflammable

material.












5.2. Bath fluids

Caution:

Carefully read the safety data sheet of the bath fluid used, particularly with regard to
the fire point!
If a bath fluid with a fire point of

65 °C is used, only supervised operation is possible.

Water: The quality of water depends on local conditions.
 Due to the high concentration of lime, hard water is not suitable for temperature

control because it leads to calcification in the bath.

 Ferrous water can cause corrosion - even on stainless steel.
 Chloric water can cause pitting corrosion.
 Distilled and deionized water is unsuitable. Their special properties cause

corrosion in the bath, even in stainless steel.

Advertising
This manual is related to the following products: