Gas equipment start-up – Kees IFG (INDIRECT FIRED GAS) MAKE-UP AIR UNITS - Duct Furnace Installation & Maintenance Manual User Manual

Page 27

Advertising
background image

– 27 –

Remarks:

_____________________________________________

__________________________________________________
__________________________________________________

GAS EQUIPMENT

START-UP

Customer ____________________________________ Job Name & Number _________________________

PRE-INSPECTION INFORMATION

With power and gas off.

Type of Equip:

Rooftop

DF

Serial Number _________________________ Model Number __________________________

Name Plate Voltage:

_____________

Name Plate Amperage: _____________

Type of Gas:

Natural

LP

Tank Capacity _______ lbs.

Rating: ______ BTU @ ____ F°

Are all panels, doors, vent caps in place?

Has the unit suffered any external damage?

Damage ______________________________

Does the gas piping and electric wiring appear to be installed in a professional manner?

Has the gas and electric been inspected by the local authority having jurisdiction?

Is the gas supply properly sized for the equipment?

Were the installation instructions followed when the equipment was installed?

Have all field installed controls been installed?

Do you understand all the controls on this equipment?

(DO NOT START this equipment unless you fully understand the controls.)

GENERAL

With power and gas off.

Make certain all packing has been removed.

Tighten all electrical terminals and connections.

Check damper linkages for tightness.

Check all fans & bowers for free movement.

Check all controls for proper settings.

Check all set screws on blowers and bearings.

Check belt tightness.

BLOWER

With power on and gas off.

Check voltage L1 _____ L2 _____ L3 _____

Check rotation of main blower.

Check motor amps L1 _____ L2 _____ L3 _____

Blower RPM _____________

Check air filters.

(Record quantity & size.)

GAS HEATING

With power and gas on.

Inlet gas pressure.

__________ in. W.C.

Pilot & main burner ignition.

Manifold gas pressure. __________ in. W.C.

Cycle on HIGH LIMIT.

Cycle firestat and/or freezestat.

Check electronic modulation. Set at: __________

Check mechanical modulation. Set at: ________

Cycle and check all other controls not listed.

Check operation of remote panel.

Entering air temp. __________ °F

Discharge air temp. (high fire) __________ °F.

External static pressure _________ in. W.C.

Cycle by thermostat or operating control.

Advertising