4 preparing the commissioning procedure, Commissioning – Lenze 8400 BaseLine Manual User Manual

Page 86

Advertising
background image

Commissioning

Preparing the commissioning procedure

7

86

EDS84ABD302 EN 4.0

7.4

Preparing the commissioning procedure

You need the following for commissioning:

ƒ

The integrated keypad

ƒ

Mains voltage

or

ƒ

Computer with Windows® operating system (XP or 2000)

ƒ

Lenze PC software »Engineer«

ƒ

Connection with the controller via an interface, e.g.
– Diagnostic interface X6 with USB diagnostic adapter

ƒ

Software manual for the technology application used

ƒ

The communication manual for the network of the automation platform

ƒ

Mains voltage

Follow the instructions of the software and/or read the documentation.

Advertising