4 preparing the commissioning procedure, Commissioning – Lenze 8400 BaseLine Manual User Manual
Page 86
Advertising
Commissioning
Preparing the commissioning procedure
7
86
EDS84ABD302 EN 4.0
7.4
Preparing the commissioning procedure
You need the following for commissioning:
ƒ
The integrated keypad
ƒ
Mains voltage
or
ƒ
Computer with Windows® operating system (XP or 2000)
ƒ
Lenze PC software »Engineer«
ƒ
Connection with the controller via an interface, e.g.
– Diagnostic interface X6 with USB diagnostic adapter
ƒ
Software manual for the technology application used
ƒ
The communication manual for the network of the automation platform
ƒ
Mains voltage
Follow the instructions of the software and/or read the documentation.
Advertising