PREPARE WALL CABINET

1. Prior to wall cabinet installation, remove doors

and door mounting hardware.

2. Cut an opening into the bottom panel to the

dimensions shown.

3. Cut out openings for the duct and electrical

wiring.

4. Install cabinet on the wall and secure per cabinet

manufacturer’s recommendations. The cabinet

must be securely fastened to studs and framing

behind the drywall prior to hood installation.

Cabinet-

Widht

“A”

“B”

28-1/2”

15”

30”

34-1/2”

18”

36”

40-1/2”

21”

42”

PREPARE THE HOOD

1. Loosley assemble both mounting brackets to

the hood using M4 x 30mm machine screws

and flat washers.

2. Place the 8” damper/duct connector on top of

the range hood discharge opening. Remove

tape from damper flaps.
Secure with (4) 3.9 x 9.5mm screws.

3. Assemble wall spacer to the hood with (3) 3.9 x

9.5mm screws.

NOTE: The spacer is designed to fill a 5/8” gap

between the wall and the back of the hood. If

the gap is larger, a non-combustible material

that is in compliance with local building codes

must be used to fill this gap.

MOUNTING SCREWS

(3.9x9.5mm)

WALL

SPACER

MOUNTING SCREWS

(3.9x9.5mm)

MACHINE

SCREWS

(M4x30mm)

WASHERS