Serum distribution assembly, Connect the hoses, Serum distribution assembly 20 – MTS Bionix EnviroBath User Manual

Page 20: Bionix® envirobath™ chamber, Installation, Important operational tips

Advertising
background image

Bionix® EnviroBath™ Chamber

20

Installation

Serum Distribution Assembly

The following illustration shows a typical setup using a serum distribution
system. The illustration uses the EnviroBath 6/10 chamber as an example; the
setup for an EnviroBath 1 chamber would be similar.

Connect the hoses

Cut tubing to the appropriate length and push the tubing onto the quick coupling.
Connect the quick coupling connectors to the circulating bath and EnviroBath
chamber connectors.

USE ONLY I/P-82 PUMP TUBING

AT SUCTION LINE

COUPLING

TEMP CONTROL FUNCTION

EXCEPT AT TUBE PUMP

(USE DEMINERALIZED WATER)

(1/2 INCH ID)

USE 1/2 INCH ID

THERMOMETER

USE 1/2 INCH ID

19L RESERVOIR - PROTEIN SERUM

FOR ALL CONNECTIONS

SILICONE EXTENSION TUBING

HEATER/CIRCULATOR

SILICONE EXTENSION TUBING

QUICK

QUICK

TUBE PUMP

BIONIX CHAMBER

COUPLING

COUPLING

QUICK

COUPLING

QUICK

28L RESERVOIR WITH ACTIVE

GLASS

AT PUMP

3-WAY VALVE

LOSS AND FLUID EVAPORATION.

IMPORTANT OPERATIONAL TIPS

:

GRAVITY DRAIN SYSTEM:

TUBING ROUTING FROM UPPER QUICK COUPLING MUST

1.

BE GENERALLY DOWNWARD.

LOWER QUICK COUPLING MUST BE ABOVE RESERVOIR

2.

FOR CHAMBER TO DRAIN COMPLETELY WHEN PUMP IS

SWITCHED OFF.

BEWARE OF OVER FILLING CHAMBER: UNDER STEADY-

3.

STATE CIRCULATION CHAMBER FLUID LEVEL WILL

TYPICALLY BE 2-4 CM (3/4"-1-1/2") ABOVE UPPER QUICK

COUPLING PORT. DO NOT ALLOW IT TO REACH THE

UPPER SURFACE OF THE SAMPLE COMPARTMENT.

THE TUBING PUMP HAS A VARIABLE SPEED SETTING.

4.

DETERMINE A PUMP SPEED WHICH RESULTS IN A SAFE

STEADY-STATE FLUID LEVEL.

DUAL RESERVOIR HEAT EXCHANGER

DUE TO LOSSES THROUGHOUT THE HEAT

5.

EXCHANGE SYSTEM, HEATER SET POINT

TEMPERATURE MAY NEED TO BE 5 C TO 10 C

ABOVE DESIRED TEST FLUID TEMPERATURE.

EXAMPLE: FOR A 37 C TEST FLUID TEMPERATURE

START WITH A HEATER SET POINT OF 47 C. ADJUST

AS NEEDED.

FOR BEST MEASUREMENT ACCURACY MAINTAIN

6.

125MM IMMERSION DEPTH FOR GLASS

THERMOMETER.

PLACE FOAM INSULATION AROUND CARBOY

7.

AND OVER HEATER RESERVOIR TO MINIMIZE HEAT

Advertising