Anchoring the load unit – MTS Landmark Floor Standing User Manual

Page 55

Advertising
background image

Loosen the Manual Crosshead Locking Bolts

Description

Item

136 N·m (100 lbf·ft)

1

271 N·m (200 lbf·ft)

2

271 N·m (200 lbf·ft)

3

Loosen the Manual Crosshead Locking Bolts

Description

Item

190 N·m (140 lbf·ft)

1

3. Cycle the lock control to unclamp, and then reclamp, the crosshead.

4. Use the lock control to unclamp the crosshead. Wait 30 seconds for the pressure in the crosshead locks

to drop to zero.

5. Use the lift control to position the crosshead where you want it.

6. Use the lock control to clamp the crosshead to its current position. Wait 30 seconds for the locks to fully

clamp the columns.

Anchoring the Load Unit

In some situations, it might be necessary to anchor the load unit to the floor. It is possible, though uncommon,
for the load unit to creep during some types of testing. An example would be high frequency testing within
the floor’s resonant frequency range. Contact MTS for additional information.

MTS Landmark™ Floor Standing Load Units Product Information 55

Installation

Advertising
This manual is related to the following products: