Ab e c as sa e da di – Retsch TWISTER User Manual
Page 25
Operating the machine
25
Pos : 7. 36 /00005 Ü berschrif ten/ 1. 1 Ü bersc hrift en/ 1. 1 Übersc hrift en BD A/ 11 Z ykl on Mont age @ 2\ mod_1277451406744_9.doc @ 20490 @ 2 @ 1
5.14 Cyclone assembly
Pos : 7. 37 /00010 Bedi enungsanleit ung en Kapitels ammlungen/T wis ter Mill ( 2011) /0015 Z yklon Mill T wis ter Bedi enung/ 1525 N IR Modul Z ykl on Mont ag e @ 3\ mod_1284536118263_9.doc @ 23332 @ 33 @ 1
Fig. 17: Cyclone assembly with filter bag / extraction
5.14.1 Cyclone assembly with filter bag
•
Screw the hopper (E) into the cyclone cassette (C) from below.
•
Screw the immersion tube (B) into the cyclone cassette (C) from above.
•
Screw the filter bag (A) onto the hopper (B).
5.14.2 Cyclone assembly with extraction
•
Screw the hopper (E) into the cyclone cassette (C) from below.
•
Place the immersion tube (AS) into the cyclone cassette (C) from above.
•
Insert the extraction device (SA) in the immersion tube (AS).
Inner diameter of the immersion tube (AS): 31.2mm [di]
Outer diameter of the immersion tube (AS): 36mm [Da]
A
B
E
C
AS
SA
E
Da
di