St ks1, Operating the machine, 11 creating interface connection – Retsch PT 100 User Manual

Page 24

Advertising
background image

Operating the machine

24

Remove the plastic screw (KS1).

Screw the stand rod (ST) onto the housing.

Fig. 4: Inserting the stand rod

Mount the (HT) support.

Adjust the swivel distance. To do so, loosen the threaded pin (GS) in the
locking disk (RS).

Adjust the swivel distance so that the feeding chute is positioned in the centre over
the feed hopper at the anti-clockwise limit stop and the support (HT) is swung out
at the clockwise limit stop.

Tighten the threaded pin (GS) in the locking disk (RS) again.

Align the DR 100 chute over the PT 100 feed hopper.

The (KN) hand screw at the back of the support (HT) serves to lock the DR 100 in
position.

When the (KN) hand screw is loosened, the DR100 can be swivelled 60°. The feed
hopper with the dividing head is therefore accessible before and after the dividing
process.

NOTICE

PT 100 and DR 100 must be suitable for the same electrical mains supply (see
type plate).

Failure to comply with the ratings on the type plates on the PT 100 and DR 100
can cause damage to the electronic and mechanical components.

Pease read the DR 100 operating instructions for information on the further
operation of the DR 100.

Pos : 7. 27 /00005 Ü berschrif ten/ 1. 1 Ü bersc hrift en/ 1. 1 Übersc hrift en BD A/ 11 Sc hnitts tell enverbi ndung herst ellen @ 3\ mod_1303201613915_9.doc @ 25210 @ 2 @ 1

5.11 Creating interface connection

Pos : 7. 28 /00010 Bedi enungsanleit ung en Kapitels ammlungen/ PT100 (2011)/ 0015 PT 100 Bedienung/ 1546 PT100 M odul Schnit tst elle ansc hließ en @ 3\ mod_1303202686288_9. doc @ 25218 @ @ 1

Before mounting the DR 100, read the DR 100 operating instructions.

ST

KS1

Advertising