Assembly of bridge unit, Final assembly of box style bridge locker, Salsbury industries – Salsbury Industries 66000 Series Box Style Bridge Lockers User Manual

Page 2

Advertising
background image

Assembly of Bridge Unit

Assembly of Bridge Unit

Lay down the bridge back panel with the flanges facing up. See

illustrations above. Install the three uprights. Install four tops at the

top and four shelves at the bottom. Install the bridge doorframe,
ensuring that its frame fits outside the edges of the tops and shelves.

Raise the bridge to an upright position. Square and level the unit,

then tighten all nuts and bolts.

Final Assembly of Box Style Bridge Locker

Final Assembly of Box Style Bridge Locker

Lay the two end units on their backs. See illustration above.

Position the bridge unit between the tops of the two end units. Use

the screws holding the tops and first shelves to fasten the bridge unit

to the two end units.

Place the rod holder brackets over the ends of the rod as shown in

the illustration. Fasten the brackets to the side walls of the end units

using the holes provided.

Finally, stand the assembled box style bridge locker upright.

SALSBURY INDUSTRIES

1010 East 62

nd

Street, Los Angeles, CA 90001-1598

Phone: 1-800-562-5377 Int’l Phone: 323-846-6700

Fax: 1-800-562-5399 Int’l Fax: 323-846-6800

www.lockers.com engineering

@

lockers.com

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2010 Salsbury Industries. All rights reserved. (Rev. 01, 8/25/2010)

Advertising