Installation instructions, Salsbury industries, Vertical corner filler and flat top corner filler – Salsbury Industries 33000 Series Designer Lockers Options User Manual

Page 2

Advertising
background image

Designer Locker Options - 33000 Series

Installation Instructions

SALSBURY INDUSTRIES

1010 East 62

nd

Street, Los Angeles, CA 90001-1598

Phone: 1-800-562-5377 Int’l Phone: 323-846-6700

Fax: 1-800-562-5399 Int’l Fax: 323-846-6800

www.lockers.com engineering

@

lockers.com

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2012 Salsbury Industries. All rights reserved. 2/20/12 Page 2 of 3

Vertical Corner Filler and Flat Top Corner Filler

Vertical corner fillers are comprised of a 3” and a 2” wide piece, each

72” long. Install the vertical corner filler pieces by vertically

overlapping the 3” wide piece beyond the 2” wide piece as shown in

the illustration. Fasten the pieces to the lockers by installing screws
from inside the lockers into the vertical corner fillers. Install optional

48” long cleats for greater stability by installing screws from inside

the lockers into the cleats. Install two 12” long cleats 1/4” from the

top edge of the lockers by installing screws from inside the lockers
into the cleats then install two additional cleats at the same elevation

onto the wall. Fasten the flat top corner filler to the cleats with liquid

nails (or similar product). Notch the flat top corner filler to fit behind

the vertical filler. #8 x 1-1/4” screws are provided for installation of
the vertical filler and cleats.

Vertical Corner Filler and Sloping Hood Corner Filler

Vertical corner fillers are comprised of a 3” and a 2” wide piece, each

72” long. Install the vertical corner filler pieces by vertically

overlapping the 3” wide piece beyond the 2” wide piece as shown in

the illustration. Fasten the pieces to the lockers by installing screws
from inside the lockers into the vertical corner fillers. Install optional

48” long cleats for greater stability by installing screws from inside

the lockers into the cleats. Install two 12” long cleats 3/4” from the

top edge of the sloping hoods by installing screws into the cleats and
through the sloping hoods then install two additional cleats onto the

wall to support the sloping hood corner filler. Fasten the sloping

hood corner filler to the cleats with liquid nails (or similar product). #8

x 1-1/4” screws are provided for installation of the vertical filler and
cleats.

Advertising