Salsbury Industries 40000 Series Heavy Duty Plastic Lockers User Manual

Locker installation instructions

Advertising
background image

Heavy Duty Plastic Lockers – 40000 Series

Locker Installation Instructions


Thank you for selecting 40000 Series Heavy Duty Plastic Lockers. We are confident that the quality and construction of the lockers will prove to be a
good investment. These instructions are intended to assist you in the assembly, placement, and anchoring of your lockers. Individual job conditions

will dictate whether the lockers must be anchored to the wall, the floor, or both.


Separate parts from packaging and make sure all parts are accounted for before discarding any packaging
material. If any parts are missing, do not begin installation until you obtain the missing parts.

Lockers should be installed in a climate-controlled environment and shielded from direct sunlight. All lockers
must be either secured against a wall or installed back-to-back (for island configuration).

Make sure all floors and walls are clean and smooth. Remove loose impediments, such as protruding nails, and

other debris which could affect installation. The lockers must be square and level and floor supported or they will
not operate properly. A locker that is square may not be level, so be sure to check both.

Review your locker layout drawings and verify the number of lockers and components before beginning
installation.

Carefully lift lockers at the base when moving and positioning. Do not drag the lockers.


LOCKER BASES MUST BE SQUARE AND LEVEL, AND ANCHORED TO THE FLOOR BEFORE THE LOCKERS ARE

INSTALLED. THE LOCKERS WILL NOT OPERATE PROPERLY IF THE BASE IS NOT SQUARE AND LEVEL AND
NOT FLOOR-SUPPORTED. A LOCKER BASE THAT IS SQUARE MAY NOT BE LEVEL, SO BE SURE TO CHECK

BOTH.

FAILURE TO COMPLY WITH THESE INSTRUCTIONS MAY RESULT IN PERSONAL INJURY AND/OR PROPERTY

DAMAGE AND WILL VOID THE LOCKER WARRANTY.




Tools required: Tape measure - - - 9/32” drill bit - - - hammer drill for drilling into concrete - - - 6’ level and shims - - - power drill - - - Phillips driver

bit - - - clamps - - - 3/16” masonry drill bit (6” long minimum) - - - circular saw - - - right-angle power drill - - - chalk and string.

The following tips may be helpful: A string line along the top and bottom of the lockers may be used to help in alignment. If shims are required
after locker installation is complete, remove obstructive screws, apply the shims, then replace the screws. Avoid twisting the locker frames when

applying shims.

SALSBURY INDUSTRIES

1010 East 62

nd

Street, Los Angeles, CA 90001-1598

Phone: 1-800-562-5377 Int’l Phone: 323-846-6700

Fax: 1-800-562-5399 Int’l Fax: 323-846-6800

www.lockers.com engineering

@

lockers.com

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2010 Salsbury Industries. All rights reserved. (Rev. 05, 1/13/2010) Page 1 of 6

Advertising