Heavy duty plastic lockers – 40000 series, Sloping hood installation instructions – Salsbury Industries 40000 Series Heavy Duty Plastic Lockers User Manual

Page 5

Advertising
background image

Heavy Duty Plastic Lockers – 40000 Series

Sloping Hood Installation Instructions



LOCATION OF HOLES IN WALL STRIPS

1. Fit the groove of the first slope top over the front edge of the locker. Rest the back edge of the slope top onto the wall strip. The 12” wide and the
36” wide slope tops are the same except for width and are installed in the same manner.

2. Fit the groove of the next slope top section over the front edge of the locker and rest its back edge onto the wall strip.

3. Secure the slope tops to the lockers with the #8 x 1-1/4” long screws provided. Do not overtighten screws.

4. Install the remaining slope tops.

NOTE: If desired, caulk the gap in the back edge of the slope top where it meets the wall strip.

SALSBURY INDUSTRIES

1010 East 62

nd

Street, Los Angeles, CA 90001-1598

Phone: 1-800-562-5377 Int’l Phone: 323-846-6700

Fax: 1-800-562-5399 Int’l Fax: 323-846-6800

www.lockers.com engineering

@

lockers.com

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2010 Salsbury Industries. All rights reserved. (Rev. 05, 1/13/2010) Page 5 of 6

Advertising