Remote system, Installation – Sportsliter Solutions Remote System User Manual

Page 4

Advertising
background image

REMOTE SYSTEM

INSTALLATION

Direct Embedded Foundation Design Sample (Fig. 1)

(This is a samply only, your SLS installation will require it’s own design)

SURFACE

POLE

PLAYING SURFACE
ELEVATION

THIS DIMENSION MUST BE
HELD TO WITHIN + 3 FEET.

X

STEEL

ANC

HO

R

BA

SE

P

O

LE

, C

A

P

PL

A

TE

M

O

UN

TE

D

CR

O

SS

AR

M

D

IR

EC

T

EM

BE

DD

ED

P

O

LE

,

STEEL

O

R

C

O

NCR

ET

E

, CA

P

PL

A

TE

CR

O

SS

AR

M

D

IR

EC

T

EM

BE

DD

ED

P

O

LE

, S

TE

EL

O

R

C

O

NC

RETE

, C

LA

M

P-

O

N

C

RO

SS

AR

M

2’

X

3’

X

CROSSARM ASSEMBLY
MOUNTING ELEVATION

EMBEDMENT

Pole Elevations (Fig. 3)

3

BASEBALL & SOFTBALL LAYOUTS

45°

TYP.

CROSSARM ASSEMBLY

VEWING

POINT

TYPICAL LAYOUTS ARE 4 OR 6 POLES PER FIELD.
VARIOUS POLE LOCATIONS SHOWN.

90°

TYP.

POLE.

HANDHOLE AND REMOTE
HEADS TO BE ON PLAYING
FIELD SIDE (TYP.)

HOME PLATE

PARALLEL TO BASE LINE UNLESS NOTED

FOOTBALL, SOCCER & TENNIS LAYOUTS

PARALLEL TO SIDE LINE UNLESS NOTED

Pole Location / Alignment Details (Fig. 2)

NOTES:
Identify pole locations on site per Hubbell Application Engineering Documentation.
Insure that all viewing points are a safe distance from poles during the erection process.
A distance equal to 1½ mounting heights minimum is recommended.
Refer to

Figs 4 & 5 for additional alignment details.

Advertising