Titus TAO IOM User Manual

Titus Equipment

Advertising
background image

TAO-IOM-1.1 3-14-14

Receiving Inspection

After unpacking the unit, check it for shipping damage. If
any shipping damage is found, report it immediately to
the delivering carrier. Store units in a clean, dry location
prior to installation.

Installation Instruction

Step 1:
Remove the front mounting base panel by unscrewing it
from the mounting base as shown in Figure 1.

7$2

TAO – Temperature Ambient Optimizer
Floor Mounted Chilled Beam with Perimeter Heating Coil

Step 3:
Remove the front cover with the help of two screw
drivers by lifting up and pulling out as shown in Figure 3
to have access to the inside of the unit.

Step 2
Uninstall the front cover by taking off the décor strip with
the help of flat head screw driver and unscrewing six
screws as shown in Figure 2.

Step 4:
Unscrew the front accent panels. See Figure 4.