TruXedo Deuce 2 GM With Track System User Manual

Page 2

Advertising
background image

P/N 1117777 Rev A

by truXedo, Inc.

P.O. Box 1078, 2209 Kellen Gross Dr., Yankton, SD 57078

Phone: 877- 878-9336 • Fax: (605) 664-9304 www.truxedo.com

GM W/tracks Deuce 2 InstaLLatIOn InstructIOns (cOntInueD)

3a

Tighten clamps securely on side

rails before driving vehicle.

WARNING

1

These instructions replace steps 2 & 3 in the Deuce 2 owners manual.

!

2

4

Install Underbody Rails: Two plastic shims and two

clamps will be used for each underbody rail. Using

a grease pen make a mark 30-1/4” back from the

bulkhead. Place shims onto pickup bed rail (SEE

STEP 3). Align the rear of the underbody rail flush

with the mark you made. Press the underbody rail

against the top and inside of the pickup bed rail. Place

clamps directly over shims and tighten.

Continue with step 4 in the main Deuce 2 manual.

30 1/4”

CAB END

30 1/4”

SHIMS

If pickup box has bed caps place shims in between

the bed caps and the bed rail as shown below.

3b

If pickup box DOES NOT have bed caps place shims

against bed rail as shown below.

SHIM

SHIM

BEDCAP

Install Side Rails: Two plastic shims and two clamps will be used for each side rail. Place shims onto pickup bed rail as

shown below. Align the front of the side rail flush with the rear of the underbody rail. Press the side rails against the top

and inside of the pickup bed rail, making sure the seal is compressed against the top of the bed rail. Place clamps directly

over shims and tighten.

FLUSH

WITH BEDCAPS

WITHOUT BEDCAPS

SHIM

Advertising