Unisteer 8012200-01 Ford Torino Big Block Rack Kit 1968-70 User Manual

Page 13

Advertising
background image

Page 13

657110

12. Now install the power steering hoses. Route hoses from the pump looped over and down to the front

of the rack. Connect the hoses to the pump. They can only attach to the pump one way. Make sure
the hoses are away from the headers. The smaller diameter hose is the pressure line and mounts to
the lower larger port of the rack. The large diameter hose is the return line and mounts to the upper
smaller port of the rack. Use the provided hydraulic stop leak on each side of all crush washers and
tighten each banjo fitting. Once tight with the stop leak do not break loose. A leak free seal may not
be created a second time with the crush washers on the banjo fittings.

Advertising