Fastener torque specifications, Instructions – Rockwell Automation 1336S_F_T_E_R C-Frame Front End Conversion Kit User Manual

Page 3

Advertising
background image

1336 PLUS, PLUSII, IMPACT, and FORCE C-Frame Front End Conversion Kit

3

Fastener Torque
Specifications

Fastener Torque Specifications are listed in

Table A

.

Table A Fastener Torque Specifications

Instructions

1. Back-up the programming of the drive being converted before

proceeding:

Store the programming of the drive in the HIM (if applicable to your

HIM) or

Use Drive Tools, Drive Explorer, or Drive Explorer Light to back-up

the programming of the drive.

2. Remove and lock out the line power from the existing C-frame drive that

will be converted.

3. For disassembly instructions, refer to Chapter 3 in the Troubleshooting

Guide. The 1336-CONVCF-SPxA Kit is shown in

Figure 1 on page 5

.

4. An illustration of the CONVCF Kit with numbered cables and wires is

shown in

Figure 2 on page 6

. The cables have the destination connector

number on them.

5. For assembly instructions refer to Chapter 3 in the Troubleshooting

Guide.

6. Re-connect the power and control wiring. Torque specs are listed in

Table A

.

Component

Fastener Application

Torque lb-in.

Torque N-m

Main Control Board Mounting Plate

8 – 10

0.9 – 1.1

Gate Driver Board Mounting Plate

8 – 10

0.9 – 1.1

Precharge Board Mounting Plate

8 – 10

0.9 – 1.1

Bus Capacitor Bank

Bank to chassis

25 – 31

2.8 – 3.5

DC Bus Inductor

Wires to bus bars

25 – 31

2.8 – 3.5

DC Bus Inductor

TB1 mounting plate to chassis

25 – 31

2.8 – 3.5

Snubber Board

Bus bars to capacitor bank

25 – 31

2.8 – 3.5

Snubber Board

Board to SCR1

25 – 31

2.8 – 3.5

Snubber Board

Board to PM1 – PM3

30 – 39

3.4 – 4.4

Power Modules PM1 – PM3

Module to heat sink

25 – 31

2.8 – 3.5

Input Rectifier

Rectifier to heat sink

25 – 31

2.8 – 3.5

Bus Fuse F1

Fuse to chassis

200 – 220

22.6 – 24.8

Thermistor

Thermistor to heat sink

Hand tighten only

TB1

Wires to terminals

25 – 31

2.8 – 3.5

TB2

Wires to terminals

8

0.9

TB3

Wires to terminals

8

0.9

Ground Sense CT

Bracket to chassis

25 – 31

2.8 – 3.5

Ground Sense CT

Positive bus bar junction

25 – 31

2.8 – 3.5

Ground Sense CT

Bus bars to capacitor bank

25 – 31

2.8 – 3.5

!

ATTENTION: Make sure the two shorting devices
shown in

Figure 3 on page 6

are removed before

connecting into J7 and J8 of the Gate Driver Board.