Starter kits r m, 4c 3, 4a 4b 4b – Rockwell Automation 1397 Blower Motor Starter Inst. User Manual

Page 7: 4b 4b 4a 4c, 5fu 4 fu

Advertising
background image

1397 Blower Motor Starter

7

1397-5.20 April, 1998

REMOVE

STARTER KITS

R M

2

83

5FU

4

FU

282

281

183

182

181

Man|Aut

16

A

18

13

15

6

4

2

R

R

0

95

96

97

98

T1

T2

T3

5

-

13

2

-2

T1

3

-4

T2

4

-6

T3

5

-

14

REPLACE WITH

LITTLEFUSE, TYPE CCMR, 600V 2.5A

13FU

14FU

15FU

2

-1

L1

3

-3

L2

4

-5

L3

P8

L2

L1

288

289

1

2

Man|Aut

16

A

18

13

15

6

4

2

R

R

0

95

96

97

98

T1

T2

T3

5

-

13

2

-2

T1

3

-4

T2

4

-6

T3

5

-

14

REPLACE WITH

LITTLEFUSE, TYPE CCMR, 600V 2.5A

13FU

14FU

15FU

2

-1

L1

3

-3

L2

4

-5

L3

OFF

R M

STARTER KITS

283

81

82

83

5FU

4FU

!

DANGER

RISK OF ELECTRICAL SHOCK. DISCONNECT INPUT
POWER BEFORE SERVICING EQUIPMENT.

P/N 33145

282

281

288

289

Man|Aut

16

A

18

13

15

6

4

2

R

R

0

95

96

97

98

T1

T2

T3

5

-

13

2

-2

T1

3

-4

T2

4

-6

T3

5

-

14

REPLACE WITH

LITTLEFUSE, TYPE CCMR, 600V 2.5A

13FU

14FU

15FU

2

-1

L1

3

-3

L2

4

-5

L3

Man|Aut

16

A

18

13

15

6

4

2

R

R

0

95

96

97

98

T1

T2

T3

5

-

13

2

-2

T1

3

-4

T2

4

-6

T3

5

-

14

REPLACE WITH

LITTLEFUSE, TYPE CCMR, 600V 2.5A

13FU

14FU

15FU

2

-1

L1

3

-3

L2

4

-5

L3

L2

L1

4c

4c

3

183/L3

181/L1

183/L3

182/L2

182/L2

4c

L3

L3

P8

2

181/L1

4a

4b

4b

400-600HP/460V
Drive Installation
Dual Blower Motor Applications

Important:

Each blower motor requires it’s own Blower Motor

Starter. 400-600HP 1397 drives have provisions for mounting
up to (2) Blower Motor Starters. For single blower motor
applications, the starter kit may be mounted at either location
on the fuse block. For applications requiring more than (2)
blower motors, consult the factory.

2

Remove and lock-out all incoming power to the
drive. Loosen the (4) phillips head screws on the
molded fuse block and slide each kit’s keyed
mounting slots over the screws. Torque to 6.22
N-m (55 lb-in.).

4

Loosen the harness fastener screws .

Connect and route the leads of each long 3-conductor wire harness from the bottom of the Blower Motor Starters
under the harness fasteners to the top of the line fuses as shown .

Hand tighten the harness fastener screws to secure each harness.

3

Locate the P8 jumper connector assemblies. Remove the jumper plugs and connect the P8 jumper assemblies to each
Blower Motor Starter’s matching connector.

1

Disconnect wires 181, 182 & 183 from the back
of each Blower Motor Starter fuse block and
discard them.

4b

4b

4a

4c

Advertising