Rockwell Automation 1609-5000CCT Isolation Step-Down Transformer User Manual

Page 6

Advertising
background image

4

Installation

Tower to
Rack-Mount
Conversion

• The transformer must be installed directly above the UPS in the rack.

• If your configuration includes the optional bypass panel, ensure that the bypass panel is

installed above the transformer in the rack. Refer to the bypass panel manual for installation
instructions.

• Refer to the RT Tower to Rack-Mount Conversion Guide and Rail Installation Guide

(1609-PRK1) for conversion and installation details.

4. Secure the transformer to the UPS.

a. Locate the two screws and three tie brackets

from the literature kit.

b. Secure the appropriate tie bracket with screws to

the top of the units

.

c. Reuse the screws removed in step 3 to secure tie

brackets

at the top and bottom of the units.

5. Reuse the screws removed in step 2 to secure the

covers to the UPS

and transformer

.

6. Install the transformer bezel

to the front of the

unit.

Advertising