Installation – Rockwell Automation 1397 60HP AC Line Disconnect Installation User Manual
Page 3
1397 – 5.11 March 1997
1397 60HP AC Line Disconnect
3
Installation
(continued)
181
81
82
83
81
(L1)
82
(L2)
83
(L3)
AC Line
Connection
182
183
c
a
a
b
b
b
b
181
182
183
torque all bolts to
6.22 N-m (55 lb-in)
a
a
❏ 2 In the A-B Plastic bag included with the kit:
a Use the (4) small split lock washers and (4) M4
✕
80 bolts
(
not M4
✕
90 bolts) to secure the AC Line Disconnect to the
molded fuse block.
b Use the (3)
1
⁄
4
-20
✕
5
⁄
8
” anodized bolts and (3)
1
⁄
4
” anodized
split lock washers to connect leads 181, 182
&
183 at the AC
Line Disconnect as shown.
c Peel and place the AC line input label on the AC Line
Disconnect as shown.
❏ 3 Connect the other end of leads 181, 182
&
183 to 1FU 2FU
&
3FU respectively.
Reconnect AC line leads L1, L2
&
L3 to the top of the AC Line
Disconnect.
The remaining kit hardware is not required.