three (3) sheet metal screws or rivets. Next, install an optional New Buck Corporation
chimney connector to the flue exit of the heater or you may use “Ell” brackets to fasten the
pipe to the stove.


4. Install Single Wall Connector and chimney system per manufacturer’s written operating in-

structions. See manufacturer’s list of tested pipes in this manual.






Figure 5




















Figure 6




B. Wall Exit Into Metal Tee-Box


1. Mark the plumb line on the wall directly behind the center of the heater. (See Figure 6.)

NOTE: When using #24 ga. minimum blue or black steel pipe maintain 18" between pipe and
ceiling.

2. Place the vertical portion of the heater pipe and the elbow in position and project a point

onto the plumb line level with the center of the elbow.

3. Measure up so there will be at least 1/4" rise per foot of horizontal connector pipe,