Bendix Commercial Vehicle Systems AD-IP INTEGRAL PURGE AIR DRYER 5/07 User Manual

Page 15

Advertising
background image

15

FIGURE 11 - WIRING - REMOTE POWER & LOCAL
GROUND

GROUND

LEAD

1/4" or 3/8"

EYELET

FRAME RAIL

STAR WASHER

NUT

14 GAGE POWER WIRE

FROM VEHICLE

WIRE HARNESS

CONNECTOR

(TO AIR DRYER)

WEATHERPROOF

POWER LEAD

SPLICE

TESTING THE AD-IP

AIR DRYER

Before placing the vehicle in service, perform the following
tests.

1. Close all reservoir drain cocks.

2. Build up system pressure to governor cutout and note

that the AD-IP

air dryer purges with an audible escape

of air.

3. “Fan” the service brakes to reduce system air pressure

to governor cut-in. Note that the system once again builds
to full pressure and is followed by a purge at the AD-IP

air dryer exhaust.

4. It is recommended that the following items be tested for

leakage to assure that the AD-IP

air dryer will not cycle

excessively.
(A) Total air system leakage (See Bendix publication

BW5057 “Air Brake Handbook.”)

(B) Compressor unloader mechanism.
(C) Governor.
(D) Drain cock and safety valve in first (supply) reservoir.
(E) All air connections leading to and from the first

(supply) reservoir.

(F) Delivery check valve.

Advertising