Bendix Commercial Vehicle Systems AD-IP INTEGRAL PURGE AIR DRYER 5/07 User Manual

Page 4

Advertising
background image

4

FIGURE 5 - AD-IP

INTEGRAL PURGE AIR DRYER PURGE CYCLE

The actual reactivation of the desiccant drying bed begins
as dry air flows from the purge volume through the purge
orifice in the desiccant cartridge bolt, then through the center
of the bolt and into the desiccant bed. Pressurized air from
the purge volume expands after passing through the purge
orifice; its pressure is lowered and its volume increased.
The flow of dry air through the drying bed reactivates the
desiccant material by removing the water vapor adhering to
it. Generally 30 seconds are required for the entire purge
volume of a standard AD-IP

air dryer to flow through the

desiccant drying bed.

The delivery check valve assembly prevents air pressure in
the brake system from returning to the air dryer during the
purge cycle. After the 30 second purge cycle is complete
the desiccant has been reactivated or dried. The air dryer is
ready for the next charge cycle to begin. However the purge
valve will remain open and will not close until air brake
system pressure is reduced and the governor signals the
compressor to charge the system.

TURBO CUTOFF FEATURE

(Refer to Figure 6)

The primary function of the turbo cutoff valve is to prevent
loss of engine turbocharger air pressure through the AD-IP

air dryer in systems where the compressor intake is

FIGURE 6 - AD-IP

INTEGRAL PURGE AIR DRYER TURBO

CUTOFF

DESICCANT

BED

PURGE

VOLUME

DISCHARGE

PORT

EXHAUST

PURGE

VALVE

TURBO

CUTOFF

VALVE

ENGINE

TURBO

COMPRESSOR

GOVERNOR

PURGE

CONTROL

LINE

CONTROL

PORT

SUPPLY

PORT

OIL

SEPARATOR

PURGE

ORIFICE

SUPPLY

PORT

TURBO

CUTOFF

VALVE

CONTROL

PORT

PURGE

VOLUME

PURGE

VALVE

DELIVERY

CHECK VALVE

(OLD STYLE

SHOWN)

Advertising