Bendix Commercial Vehicle Systems EC-80 ABS ATC SD User Manual

Page 22

Advertising
background image

22

Pressure Modulator Valve Repair Tests:

1. Take all measurements at ECU harness connector pins in

order to check wire harness and PMV. Probe the connector

carefully so that the terminals are not damaged.

2. Pressure modulator resistance should read:

Location

Measurement

Release to Common

4.9 to 5.5 Ohms

Hold to Common

4.9 to 5.5 Ohms

Release to Hold

9.8 to 11.0 Ohms

Release, Hold, Common

Open Circuit (no continuity)

to Voltage or Ground

When troubleshooting modulator trouble codes, check

inactive trouble codes and event history for over-voltage

or trouble codes. If one of these is found, troubleshoot

these trouble codes first, before the PMV.

Cab-mount ECU: Looking into

wire harness connector

Connector

Pin PMV Location

X2

18 Way

1

Left Steer Axle Hold

2

Left Steer Axle Release

3

Left Steer Axle Common

4

Right Steer Axle Hold

6

Right Steer Axle Common

7

Right Steer Axle Release

9

Right Drive Axle Common

10 Right Drive Axle Hold
13 Right Drive Axle Release
12 Left Drive Axle Common
16 Left Drive Axle Hold
17 Left Drive Axle Release

X3

15 Way (if Bendix

®

EC-80

ATC ECU

is configured for 6

sensors)

4

Left Additional Axle Hold

6

Left Additional Axle Common

7

Left Additional Axle Release

9

Right Additional Axle Common

10 Right Additional Axle Hold
13 Right Additional Axle Release

Advertising