Meter replacement, Storing, Repackaging – Bird Technologies 3171B020 User Manual

Page 33: Storing repackaging

Advertising
background image

21

Figure 11 Replacing Fuse for External DC Input Voltage

Meter Replacement

If the meters should become defective and require replacement, proceed as outlined in the following steps:

1.

Observe the connections of the meter leads.

2.

Disconnect the leads.

Note: This will insure the correct polarity in reassembly.

3.

Loosen the clamp screw on the sides of the meter until the clamp is released.

4.

Withdraw the meter through the front panel.

5.

Reverse the above steps to install the new meter.

Storing

If the unit is not to be used for an extended period of time, store in a cool dry place where it will be free from rough
treatment, dust, and dampness.

Repackaging

Should you need to return the Wattcher unit, use the original shipping package if possible. If the original package is
not available, use a heavy duty corrugated box with shock-absorbing material around all sides of the unit to provide
firm cushion and to prevent movement in container. Container should be properly sealed.

4-40x3/16
Phillips Pan
Head Screws

Cover

4-40x3/16
Phillips Pan
Head Screws

Fuse 3AG Fast Acting .5 A

Advertising
This manual is related to the following products: