10 high pressure pump, See chapter 2.10, See chapter 2.10.1 – Metrohm 850 Professional IC Anion MCS User Manual

Page 41

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

2 Installation

850 Professional IC – Anion – MCS

■■■■■■■■

31

3

Tubing flare
With tubing nipple.

4

Clamping screw

5

Eluent aspiration tubing 6.1834.080
For aspirating the eluent. The clamping
screw (16-

4

) is firmly mounted.

6

Connection capillary 6.1834.090
Connection from the eluent degasser to the
high pressure pump (see Chapter 2.10, page
31)
. The clamping screw (16-

4

) is firmly

mounted.

1

Caution

The clamping screws (16-4) must be tightened carefully. Use the
6.2621.050 wrench for this.

Insert the eluent aspiration tubing (16-5) in the eluent degasser
input (16-1).

Carefully tighten clamping screw (16-4).

2

Insert connection capillary (16-6) (the end with the longer clamp-
ing screw (16-4)) into the eluent degasser output (16-2).

Carefully tighten clamping screw (16-4).

Connect the other end of the connection capillary (16-6) (with
the shorter clamping screw ) to the high pressure pump (see
"Connecting inlet to the high pressure pump", page 33)
.

2.10

High pressure pump

The intelligent and low pulsation high pressure pump pumps the eluent
through the system. It is equipped with a chip on which its technical spec-
ifications and "life history" (operating hours, service data, ... ) are saved.

The purge valve is used for deaerating (see Chapter 2.10.2, page 34)
the high pressure pump.

2.10.1

Capillary connections high pressure pump/purge valve

Note

All of the capillary connections of the high pressure pump and the
purge valve are already installed in the newly delivered instrument.

Advertising