Metrohm 930 Compact IC Flex Oven/ChS/PP/Deg User Manual

Page 27

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

930 Compact IC Flex Oven/ChS/PP/Deg (2.930.2360)

■■■■■■■■

19

Connecting the drainage tubing

1 Cut a piece of silicone tubing into three pieces using scissors: 2 ×

approx. 40 cm and 1 × 20 cm

2 Attach one end of the 40 cm long piece to the drainage tubing con-

nection on the bottle holder.

3 Attach one end of the 20 cm long piece to the drainage tubing con-

nection on the detector chamber.

4 Attach each of the loose ends of both pieces of silicone tubing to

one end of the Y connector.

5 Attach one end of the second 40 cm long piece to the third end of

the Y connector.

Attach the loose end to the right-side drainage tubing connection on
the base tray.

6 Attach one end of the second piece of silicone tubing to the left-side

drainage tubing connection on the base tray.

Advertising