Installation and Commissioning

Prior to use for the first time, the supplied desiccant pouch will need to be installed. Refer
to section 10.2 Replacing or Installing the Desiccant Pouch.

3.1 Mounting & Site Selection
The instrument is designed for wall mounting. If wall mounting is not practical, the
instrument can be mounted on any suitable level surface. For ease of service there should
be about 20 cm (8”) free area above the instrument; this will ensure enough room for
calibration and cuvette maintenance. Choose a location that is easily accessible for
operation and service and ensure that the front display rests at eye level. The overall
mounting dimensions of the instrument are shown in Figure 3. The recommended
mounting screws are M6 (¼”) for the instrument enclosure and M4 (#8) for the field
terminal box. The Micro TOL is designed to have the field terminal box cradled under the
sensor portion of the instrument. It is recommended that the field terminal box be mounted
first, and then the rest of the instrument be mounted on top. The template on the last page
of this manual may be used to establish mounting hole locations.

Figure 3: Overall Mounting Dimensions of the Instrument

It is critical that the instrument be mounted as close as possible to the sampling point to
ensure a quick response time (within 2-3 meters (6-10 ft) of the sampling point).