16 right 17 wrong – RCBS The Grand User Manual

Page 6

Advertising
background image

Note: In OFF position

INSTALL SPENT PRIMER TUBE ASSEMBLY

Raise ram to the top of the press stroke and install the tube as
shown in photo 15. Tighten the setscrew to secure the tube.
Do not over tighten, use 3/32 hex wrench.

INSTALL PRIMER TRAY

With ram still raised to the top of the press stroke, place Primer
Tray on Primer Tube as shown in photo 16. Primer Tray is held
in place by its own weight. Primer Tray body is to the left of the
Powder Shut Off Plate and does not ride on top of the plate
(photos 16 & 17).

3

11

14

15

12

13

INSTALL POWDER AND SHOT HOPPERS

The Powder Hopper (smaller diameter tube) is to be mounted on
the left and the Shot Hopper (larger diameter tube) on the right.

Install detent spring then ball into hopper funnel assembly and
install on the press as shown in photo 11.

Install 10-24 x 1

1

/

4

" set screw securely through hopper funnel

base and into the top of the shut off plate. Install 10-24 Nyloc
nut to secure hopper funnel base to top of press. Use 3/32 hex
wrench and 3/8 wrench (not provided).

Funnels must be tightly secured but be able to pivot between
OFF, ON and DRAIN positions. Install powder baffle through
the top of the powder hopper as shown in photo 14.

16

right

17

wrong

2429_RCBS Grand Instr 1/31/05 2:33 PM Page 6

Advertising