tekmar 264 Boiler Control User Manual

Data brochure, D 264, Boiler control 264

Advertising
background image

- Data Brochure

Boiler Control 264

D 264

12/08

1

of

32

©

2008 D

264

-

12/08

The tekmar Boiler Control 264 can control the supply water temperature from up to 4 on / off stages based on outdoor temperature,
control for Domestic Hot Water (DHW) generation, or a setpoint requirement. A large easy to read display provides current system
temperatures and operating status. The control has outputs for a primary pump and either a combustion air damper or alarm. Based
on the mode of operation selected, the control can operate different combinations of boiler stages and boiler pumps.

Additional functions include:

Installer and Advanced access levels

Primary pump output

Individual boiler pump outputs (in applicable modes)

• Pump

exercising

Pump purging (primary and boiler)

0 – 10 V (dc) input signal

Boiler demand for space heating loads

DHW demand for DHW loads

Setpoint demand for setpoint loads

Test sequence to ensure proper component operation

CSA C US certified

Setback input for energy savings

Input

Universal Sensor

Included

Input

Universal Sensor

Included

Input

Outdoor

Sensor

Included

Input

Timer or Switch

Optional

Input

0-10 V (dc)

External Signal

Input

Setpoint / DHW

Demand

Input

115 V (ac)

Power Supply

Input

Boiler

Demand

Output

Primary

Pump

Output

Boiler

Output

Pump

Or

Output

Combustion Air

or Alarm

Or

Output
DHW Pump Or
DHW Valve

M

Or

Or

External Input

Setp/
DHW

UnO

Com

1

1

0

1

H2027D

Boiler Control 264

Four Stage Boiler & DHW / Setpoint

115 V ±10% 50/60 Hz 600 VA
230 V (ac) 5 A 1/3 hp
20 to 260 V (ac) 2 VA

Ret

Boil

Made in Canada by
tekmar Control Systems Ltd.
tektra 943-02

not testing
testing

red
red

testing paused

Power
Relays
Demands

18

4

3

2

1

5

Out

Signal wiring must be rated at least 300 V.

Test

Menu

Item

19

15

14

23

Power

N

9

8

Prim

L

Com
Dem

7

6

Boil

Dem

P1

Sw

Sup

Boil

Do not apply power

Boiler Demand

DHW / Setpoint Demand

WWSD

22

C.A. /

13

Alarm

12

16 17

DHW

Pmp/Vlv

1

Relay

1

2

Relay

2

3

Relay

3

Fixed Last

Rotate

Fixed Lead

Exercise

Alarm

Adv

Installer

C.A.

Up to 2 Lo/Hi Boilers
1 Three Stage Boiler & 1 Pump

Modes

1
2
3
4

For maximum
heat, press &
hold Test for 3
seconds.

20 21

4

Relay

4

Meets Class B:
Canadian ICES
FCC Part 15

Date Code

External Input Signal

Offset

Stand Alone

Priority Override

Note:
Boiler, DHW, or
setpoint demand
must be powered
with 20 to 260 V (ac)
before the boiler is
able to fire.

Advertising