07 installing welding generator, 08 location, 09 air flow clearance – Tweco Raider 10,000 Pro User Manual

Page 14

Advertising
background image

16

2.07 Installing Welding

Generator

1. Lifting forks.
2. Lifting Eye. Use lifting eye or lifting forks to move

unit. If using lifting forks, extend forks beyond
opposite side of unit.

3. Trailer - Install unit on trailer according to trailer

manufacturing.

Movement - Do not lift unit from end.

1

2

2.08 Location

A proper installation site should be selected for the welding
generator if the unit is to provide dependable service and
remain relatively maintenance free.

CAUTION: OPERATE IN OPEN, WELL-
VENTILATED AREAS, OR IF OPERATED
INDOORS, VENT ENGINE EXHAUST OUTSIDE THE
BUILDING. KEEP ENGINE EXHAUST OUTLET
AWAY FROM BUILDING EXTERIER, INTERIER
WALLS & AIR INTAKES.

2.09 Air Flow Clearance

Maintain at least 19.7 inch (500mm) of unrestricted space
on all sides of the unit, and keep underside free of
obstructions. Do not place any filtering device over the
intake air passages of this welding generator. Warranty is
void if any type of filtering device is used.

The service life and operating efficiency of this unit is
reduced when the unit is subjected to high levels of dust,
dirt, moisture, and corrosive vapors.

WARNING: SPARKS CAN CAUSE BATTERY
GASES TO EXPLODE BATTERY ACID CAN
BURN EYES AND SKIN.

• Stop engine before disconnecting or connecting

battery cables.

• Always wear a faceshield and proper protective

clothing when working on battery.

• Do not allow tools to cause sparks when working on

a battery.

• Place the engine control switch in the STOP position.

• Remove bolts and pull out tray.

• Connect the cables

• Reinstall battery tray.

TECHNICAL SPECIFICATIONS

Advertising