05 work cable connection – Tweco CE Ultima 150 User Manual

Page 20

Advertising
background image

SECTION 3: INSTALLATION

14

Manual 0-2530

AC Input
Power Connection

A-00814

Figure 3-1 Rear Panel Input Power Connection

3.05 Work Cable Connection

High frequency pilot arc initiation generates a certain
amount of electromagnetic interference (EMI), commonly
called RF noise. This RF may interfere with other elec-
tronic equipment such as CNC controllers, etc. To further
minimize RF interference, make sure the work cable is prop-
erly connected when installing mechanized systems.

1. Make sure the work cable is securely fastened to

the WORK connection on the rear panel of unit.

2. Make a solid connection between the work clamp

and the work piece or welding machine.

Work Cable Connection

A-00818

Figure 3-2 Rear Panel Work Cable Connection

A-00141

Make a solid work cable
connection to the work-
piece or cutting table

Figure 3-3 Work Cable Connection

WARNING

Make sure the ground wire is designated GND on
the other end of the cable. Electric shock and dam-
age to the unit could occur if power is applied to the
GND terminal.

Advertising