Transmig 250i installation/setup – Tweco 250i Multi Process Welding Inverter 2RT Wire Feeder User Manual

Page 20

Advertising
background image

TRANSMIG 250i

INSTALLATION/SETUP

INSTALLATION/SETUP 3-2

Manual 0-5187

WARNING

The Transmig 250i must be electrically connected by a qualified electrical trades-person. Damage to the

PCA (Power Control Assembly) could occur if 276 VAC or higher is applied to the Primary Power Cable

50/60 Hz

Single Phase

Primary Supply

Lead Size

Minimum

Primary Current

Circuit Size

(Vin/Iin)

Minimum

Plug Size

Current & Duty Cycle

MIG

LIFT TIG

STICK

Yes

2.5mm² (Factory

Fitted)

240/15A

15A

40% @ 190A 40% @ 235A

40% @ 170A

Yes

4.0mm²

240/25A

25A

40% @ 250A 40% @ 250A

40% @ 230A

Table 3-1: Input Power Source Leads for Transmig 250i

WARNING

ELECTRIC SHOCK can kill; SIGNIFICANT DC VOLTAGE is present after removal of input power. DO NOT

TOUCH live electrical parts.

SHUT DOWN welding power source, disconnect input power employing lockout/tagging procedures. Lock-out/tagging

procedures consist of padlocking line disconnect switch in open position, removing fuses from fuse box, or shutting

OFF and red-tagging circuit breaker or other disconnecting device.
Electrical Input Requirements

Operate the welding power source from a single-phase 50/60 Hz, AC power source. The Welding Power Source must be:
• Correctly installed, if necessary, by a qualified electrician.
• Correctly earthed (electrically) in accordance with local regulations.
• Connected to the correct size power point, fuze and primary supply lead based on Table 3-1.
• Connected with a customer-supplied grounding cable to the grounding stud on the top-rear of the power source as

required by applicable Local and National Codes or local authority having jurisdiction. Grounding stud is identified

with this symbol:

WARNING

Any electrical work must be carried out by a qualified Electrical Tradesperson.

Advertising