CCI Thermal Technologies G Series - Industrial Infrared Gas Catalytic Heater User Manual

Page 5

Advertising
background image

5

Separate Installation and Operation Instructions are available for industrial heating applications.

7.0 12V HAZARDOUS

ELECTRICAL INSTALLATIONS

7.1 Most oil and gas production buildings have

an area classification as follows:

(i) Class I, Division 1, within the building.

Refer to FIGURE 7 and FIGURE 8.

(ii) Class I, Division 2, up to 10 ft (3 m) from

the building in any direction. Refer to

FIGURE 7 and FIGURE 8.

(iii) Class I, Division 2, between 10 ft (3 m)

and 25 ft (7.6 m) from the building in all

directions at an elevation of 18” (0.45 m)

above the ground. Refer to FIGURE 7

and FIGURE 8.

(iv) Connection to the power supply must be

outside of the Class I, Division 2 location.

(FIGURE 9). All electrical apparatus and

wiring within this area must conform to

the appropriate codes.

8.0 SPACE HEATING

8.1 A separate heat load calculation should

be done for each building in which a

Cata-Dyne™ heater will be installed for

space heating purposes.

8.2 The heatload calculation determines the building

heat losses through the structure and allows

for air infiltration (visit www.ccithermal.com

for the sample Heat Load Calculation).

8.3 Cata-Dyne™ heaters produce low intensity

infrared heat that is absorbed by objects

within the range of the heat source. The

closer the object is to the source of heat

the more heat the object will absorb.

Cata-Dyne™ heaters should be placed close

to the floor level within the building to heat

objects close to the floor.

8.4 Ideally, Cata-Dyne™ heaters should be

mounted 1 ft to 3 ft (0.3 m to 1 m) from the

floor and equally spaced around the building

perimeter for space heating applications.

8.5 If low mounting is not practical, then overhead

mounting may be utilized. Overhead mounted

heaters should be sloped face down to a

maximum 45° angle to direct the infrared

energy towards the floor. Overhead mounting

should be restricted to heaters of 30,000

Btu/hr (8.8 kW) capacity and larger.

8.6 If the building requires only one heater, place

the Cata-Dyne™ heater as close as possible

to the center of the longest wall.

8.7 For multiple heater installations, space the

Cata-Dyne™ heaters as evenly as possible

around the perimeter of the building.

8.8 Make sure the piping is large enough to

handle the gas load (refer to the sample

Piping Calculation in the Cata-Dyne™

catalog for sizing information).

8.9 Make sure the electrical starting system

has sufficient current carrying capacity and

conforms to all applicable electrical codes.

8.10 It is advisable to install an indicator light in

the electrical circuit to reduce the possibility

of the power being left on once the heater

is started.

10 ft.

3.0 m

15 ft.

4.6 m

Vehicle located outside

hazardous area

18 in.
0.46 m

FIGURE 7 - VEHICLE LOCATION

10 ft.
3.0 m

15 ft

4.6 m

Class I

Division 1 (Zone 1)
Class I

Division 2 (Zone 2)

Class I Division 2 (Zone 2)
18 in. (0.46 m) above ground
Subject to possible
transient vapour

FIGURE 8 - CLASSES AND DIVISIONS

25 ft.

7.6 m

+ _

Seal

OUTSIDE BUILDING - Class I Division 2

area use appropriate electrical fittings

CATA-DYNE Heater

c/w explosion proof

junction box

Standard

battery cable

Building wall

INSIDE BUILDING -

Class I Division 1 area use

appropriate electrical fittings

FIGURE 9 - POWER SUPPLY CONNECTION

Advertising