Valve and valve mount – Wheatheart Self-Propelled Post Pounder Kit User Manual

Page 24

Advertising
background image

4. I

NSTALLATION

W

HEATHEART

- S

ELF

-P

ROPELLED

P

OST

P

OUNDER

K

IT

4.5. V

ALVE

AND

V

ALVE

M

OUNT

T

RAILER

P

OST

P

OUNDER

M

ODEL

24

IM12 R3

4.5. VALVE AND VALVE MOUNT

Refer to Figure 4.8.

1. Loosen

the

1/2”

x 1” bolt on the

pounder valve mount arm (bolt not
shown) and remove.

2. Slide the SP valve mount arm over

the lower pipe on the pounder valve
mount arm and put it back in the
control mount holder. Set the pounder
control valve back into position and
retighten the bolt.

3. Install

the

handles into the valve and

attach to the SP valve mount plate
with three 5/16” x 2-1/2” bolts and
locknuts.

4. Move the SP valve mount arm into the

operating position and tighten the
bolts (Figure 4.7).

Figure 4.8

Figure 4.7

HANDLES

5/16” x 2-1/2” BOLTS

SP VALVE MOUNT ARM

1/2” X 1”
BOLT

SP VALVE MOUNT PLATE

1/2”X1” BOLT

POUNDER VALVE
MOUNT ARM

CONTROL MOUNT HOLDER

Advertising