Intake – Wheatheart Galvanized Utility Auger User Manual

Page 15

Advertising
background image

W

HEATHEART

- G

RAIN

A

UGERS

3. A

SSEMBLY

U

TILITY

3.4. I

NTAKE

30644 R1

15

Figure 3.4

3.4. INTAKE

See Figure 3.5.

Note:

To replace intake assembly with hopper assembly or to install hopper assembly,
see Section 3.8.

1. Attach intake flighting to the flighting of galvanized tube. Ensure that the 2

flightings overlap. Use two 7/16” x 2-1/4” (for 8") or two 1/2” x 2-3/4” (for 10")
bolts and locknuts and tighten securely.

2. Place intake assembly over intake flighting, ensuring that the stub shaft is

properly seated in the bushing.

3. Attach intake to the clamp-on angle flange of galvanized tube with four

7/16” x 1" bolts and locknuts.

Figure 3.5

Advertising