Install 3p/605/606nt chains, 3p/605/606nt gearbox to sgs chain, 3p/605/606nt sgs transmission chain – Great Plains 3P606NT Assembly Instructions User Manual

Page 13: 3p/605/606nt sgs final drive chain, Ud f b

Advertising
background image

Great Plains Mfg., Inc.

Installation Instructions

13

04/02/2009

133-140M

Install 3P/605/606NT Chains

Three new chains are installed to connect the gearbox to
the Small Seeds meter shaft.

59. Review “Chain Installation” on page 17 before

mounting chains.

Refer to Figure 19

3P/605/606NT Gearbox to SGS Chain

60. Select the new gearbox chain, one of:

136-057D CHAIN RL #40 42 PITCHES
136-170D CHAIN RL #40 40 PITCHES

Route the chain around the new 12T gearbox
sprocket

, the new accessory shaft input

sprocket

, and above the new left idler

.

Adjust left idler

for

1

2

in (12mm) slack in the top

span of chain

.

3P/605/606NT SGS Transmission Chain

61. Select the new transmission chain, one of:

136-115D CHAIN RL #40 142 PITCHES
136-163D CHAIN RL #40 217 PITCHES

Route the chain around the new accessory shaft
output sprocket

, around the final drive jackshaft

input sprocket

, above the new right rear idler

and below the new right front idler

.

Adjust right idlers

for 1in (2.5cm) slack in the top

span of chain

.

3P/605/606NT SGS Final Drive Chain

62. Select one new:

136-017D CHAIN RL #40 49 PITCHES

Route the chain around the final drive jackshaft out-
put sprocket

, around the final drive meter shaft

input sprocket

, and behind the final drive idler

.

Adjust final drive idler

for

1

4

in (6mm) slack in the

rear span of chain

.

Figure 19

3P/605/606NT New Chain Routing

18653

38

19

18

42

39

22

40

LEFT

RIGHT

FINAL

42

6

7

8

9

U

D

F

B

42

19

39

38

42

42

21

22

40

6

42

42

42

22

18

7

8

9

9

18

Advertising