Great Plains 3N-30P Assembly Instructions User Manual

Page 2

Advertising
background image

196-264m

4/8/2004

Great Plains Mfg., Inc.

Monitor Systems Option

2

Assembly Instructions for 833-232C 7 1/2 Row Spacing

Refer to Figures 1 and 2

1.

Mount one each of the material flow modules to
the wing frame as shown in figure 1. Mount one
each of the material flow modules to the drive
system frame as shown in figure 2.

NOTE: If there are no predrilled holes in the frame use the
templates provided, mark and drill 5/16” holes for mount-
ing modules. (Pages 9 & 10

)

2.

Place the harness wire bundle on the frame by
the material flow module. Connect the wire ex-
tensions to the openers starting at the left side
of the drill in numerical order. Wire extension
number 1 with first opener on the left. Continue
in the same manner until all wire extensions are
connected. Fasten the harness to the frame with
cable ties as shown in figures 1 and 2.

3.

Connect black and gray colored leads into the
material flow modules. Inlets are color coded.
Black to black and gray to gray.

4.

Refer to Figure 3. Attach sensor lead marked IN
from the wing frame harness to the 15’ smart
sensor extension wire. Route the 15’ extension
using the same path as the opener lift hoses al-
lowing the same slack at the drill toolbar pivots
as the other hoses. Connect this extension to
the center frame harness lead marked OUT.
Use cable ties to secure the wires in place.Mark
these extensions P-1 and P-2 for further refer-
ence.

5.

Assemble two of the 20’seed smart extensions
together then attach them to the center frame
harness sensor lead marked IN. Route the 20’
extensions through the tongue tube up to the
tractor. The left extensions will connect to Port 1
and the right extensions will connect to port 2.

NOTE: Left-hand side of drill is shown in figures. Left-
hand and Right-hand sides on the Drill are done in the
same manner. The left side will go to port 1 and the right
side to port 2.

6.

Refer to page 3 for a detailed listing of parts and
schematics for this particular monitor system.

7.

For console assembly, speed sensor and other
schematics illustrations refer to the DJ manual
found in the monitor system package.

8.

Refer to page 8 for speed sensor instructions if
sensor is being used.

NOTE: J1 accessory harness and two 20’ exten-
sions are not used if speed sensor on drills is not
used.

19217

19218

Material
Flow
Module

Harness
Wire
Bundle

Harness
Wire
Bundle

Harness
Wire
Bundle

Material
Flow
Module

Figure 3

Routing for wire Harness

19255

Figure 2 Center- Drive System Frame

Figure 1 Wing Frame

Advertising