Installing walkboards, Installing reflector decals – Great Plains 2S-2600F Predelivery Manual User Manual

Page 6

Advertising
background image

4

Section 1 Assembly

2012-04-04

2S-2600 and 2S-2600F Two-Section Folding Drill 195-201Q

Great Plains Mfg., Inc.

Installing Walkboards

Refer to Figure 1-2.

1.

Remove 1/2-by-1 3/4-inch bolts (1) and steps (2) from
outside end panels. Remove 1/2-by-1 1/4-inch bolts
(3) from inside end panels.

2.

Bolt walkboards (4) to box-support channels. Use 1/2-
by-1 1/4-inch bolts (3), lock washers and hex nuts on
inside ends of drill. Use 1/2-by-1 3/4-inch bolts (1),
lock washers and hex nuts to bolt step (2) and walk-
board (4) on outside ends of drill.

NOTE: Steps (2) are not interchangeable. They jog away
from end panel and extend back when bolted on correctly.

Installing Reflector Decals

On outside ends of drill boxes, place amber reflectors on
outside (1) and back (2) of walkboards. Refer to Figure 1-
3.

Figure 1-3

Install Reflectors, Outside Ends

On inside ends of drill boxes, place red reflectors on inside
(1) and amber reflectors on back (2) of walkboards. Install
daytime reflectors (3) on the inside. Refer to Figure 1-4.

Figure 1-4

Install Reflectors, Inside Ends

Figure 1-2

Walkboard and Step Assembly

15566

1

2

4

4

3

15528

Figure 1-2

Walkboard and Step Assembly

15566

1

2

1

2

3

15528

Advertising
This manual is related to the following products: