Installing handles and lights – Great Plains 2S-2600F Predelivery Manual User Manual

Page 7

Advertising
background image

5

Section 1 Assembly

2S-2600 and 2S-2600F Two-Section Folding Drill 195-201Q

2012-04-04

Great Plains Mfg., Inc.

Installing Handles and Lights

1.

On outside ends of drill boxes, bolt handles to boxes
as shown in Figure 1-5. Use 1/2-inch, hex-flange
screws and lock nuts.

Figure 1-5

Install Box Handles

2.

On inside ends of drill boxes, bolt warning lights to
boxes as shown in Figure 1-6. Use 1/2-inch, hex-
flange screws (1) and lock nuts.

3.

Plug warning-light leads into drill harness (2).

Figure 1-6

Install Warning Lights

4.

Check lights for correct installation. Fold drill, then
check that both lights have an amber and a red lens
facing toward rear of drill. If necessary, re-install lights
properly.

17347

17346

1

2

2

Advertising
This manual is related to the following products: