Transport Locks

Refer to Figure 7
15. Once the cylinders are connected, raised the unit

completely. If the transport locks

are in place,

remove them at this time.

Refer to Figure 8
16. Store the transport locks on the main frame as

shown

.

17. Once the locks are removed, unfold the wings.

Note: Make sure no one is under the wings during the

unfolding prosess. Watch for leaks and make sure
hoses do not get pinched during the initial unfolding
process.

18. Once the machine is unfolded, raised and lower the

machine several times to purge air from the lift
system. Again, watch for any leaks and tighten if
necessary.

19. Check the tire pressure for proper inflation and check

the tightness of lug bolts.

First time Field Adjustments

Pre-Leveling of Machine

Refer to Figure 9
Note: Pre-leveling of machine should be done on a good

level surface (preferably concrete). Machine must
be unfolded before leveling. Insure all tire pressure
is set to recommended pressure. Raise machine
and hold lever to insure that the air has been
purged from the lines.

1.

With the hydraulic fore and aft adjustment bar set to
C, lower machine till blades are just off the ground,
adjust the hitch turnbuckle until the front and rear
blades are equal distance to the ground.

2.

Adjust Wing Wheels so the blades are the same
distance off the ground as the center blades.

3.

Now adjust the gauge wheels so they are 1/2” above
the ground.

Figure 7

Transport Locks

43419

1

1

Figure 8

Transport Locks Storage

43411

2

2

Figure 9

Hydraulic Level Bar

43420