Before Installation

2

Amico Architectural

Note: Do not install studs unless

dimension ’A has been confirmed

by the Amico team

Rough Opening to accommodate
Amico Panel Wall Unit

IMPORTANT: READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE COMMENCING WORK!

Prior to Start of Any On-Site Preparations

All site preparations must be completed prior to the delivery of the panel wall units. Please contact Amico to confirm and

review all information listed below. Failure to do so may result in discrepancies/misalignments during installation.

a. Wall Rough opening dimension, see Figure 1.
b. Stud gauge and size.
c. Wall thickness (e.g. including drywall and any additional paneling mounted on the finished wall).
d. Rough-in locations.
e. Blocking locations, if applicable.
f. Shipping restrictions.

NOTE: Ceiling grid must be installed after the middle section is installed and the rails are attached to the

units.

IMPORTANT: ALL ABOVE INFORMATION MUST BE COORDINATED, CONFIRMED AND APPROVED WITH

AMICO PRIOR TO ANY ON-SITE PREPARATION IN THE AREA WHERE THE HEADWALL WILL BE INSTALLED.

Figure 1 – Rough Opening

Building Studs
on site by others

Dimension ‘A’ to

be confirmed during

final submittal

Advertising