Amico Equipment Rails User Manual

Page 7

Advertising
background image

www.amico.com

6

1. Locate the building studs in the area and align the holes of the rail to the studs. Use a level to make sure the rail is

vertical and mark the locations on the wall through the holes centered on a stud.

2. Remove and put the rail aside. Drill

3

/

16

” diameter holes into the wall at the marked locations.

3. Once all drill holes are completed, secure rail to the wall by fastening the screws through the holes and into studs.

NOTE:

The rubber stop at the bottom of the rail goes over the shank of the bottom screw. The depressible channel

stop at the top of the rail is used to secure the device, keeping it from sliding up and out of the rail tracks.

Mounting on Drywall Over Wood Studs
or 16 Gauge Steel Studs

Figure 2

Bottom of rail

Bottom of device

Top of rail

4”

19”

6”

6”

6”

Drywall

Mounting height above floor

Floor

Depressible channel stop.
Depress tab to remove slide/arm
from the wall channel.

Drill hole

Rubber stop

Drill hole

Drill hole

Drill hole

(10.16 cm)

(15.24 cm)

(48.26 cm)

Advertising
This manual is related to the following products: