Amico Equipment Rails User Manual

Page 8

Advertising
background image

7

Amico Accessories Inc.

1. Locate the building studs in the area and align the holes of the rail to the studs. Use a level to make sure the rail is

vertical and mark the locations on the wall through the holes centered on a stud.

2. Remove and put the rail aside. Drill

11

/

16

” (1.7462 cm) diameter holes into the wall at appropriate vertical spacing

according to the specific MRS configuration.

3. Once all the drill holes are completed, insert the ¼-20 x 3” (7.62 cm) Pan Head Machine Screws into the rail and

insert into the toggle wings.

4. With the rail upright, align the toggle bolts to the drilled hole and insert into the studs. Tighten the screws to secure

the rail.

NOTE:

The rubber stop at the bottom of the rail goes over the shank of the bottom screw. The depressible channel

stop at the top of the rail is used to secure the device, keeping it from sliding up and out of the rail tracks.

Refer to specific device instruction manual.

Mounting on Drywall Over Steel Studs Less than 16 Gauge

Section 4: Device Installation

Figure 3

Drywall

Bottom of rail

Bottom of device

Top of rail

4”

Mounting height above floor

Floor

19”

6”

6”

6”

Depressible channel stop.
Depress tab to remove slide/arm
from the wall channel.

Drill hole

Rubber stop

Drill hole

Drill hole

Drill hole

(10.16 cm)

(15.24 cm)

(48.26 cm)

Advertising
This manual is related to the following products: