B&G Network Pilot (ACP) User Manual

Page 70

Advertising
background image

5 - 1

SECTION 5 COMMISSIONING

NETWORK PILOT COMMISSIONING______________________________ 3

PILOT INSTALLATION CHECK LIST ______________________________ 3
DRIVE UNIT & STEERING SYSTEM _______________________________ 3

HYDRAULIC RAMS: __________________________________________ 3
BLUE SIZE 3 RAM INSTALLATION CHECK LIST ___________________ 4
HYDRAULIC PUMPS: _________________________________________ 4
ROTARY DRIVES: ___________________________________________ 4

RUDDER REFERENCE INSTALLATION____________________________ 4
LINEAR FEEDBACK UNIT INSTALLATION__________________________ 5
COMPASS INSTALLATION ______________________________________ 5
ELECTRONICS INSTALLATION __________________________________ 5

TO ENTER COMMISSIONING MODE ____________________________ 6
READY TO BEGIN COMMISSIONING ____________________________ 6
TO EXIT COMMISSIONING MODE ______________________________ 6
RE-ENTERING COMMISSIONING MODE _________________________ 7

COMMISSIONING PARAMETERS ________________________________ 7
COMMISSIONING ALONGSIDE __________________________________ 8
COMMISSIONING DURING A SEA TRIAL __________________________ 8

COMMISSIONING ALONGSIDE __________________________________ 9

SELECTING THE BOAT TYPE __________________________________ 10

SETTING THE RUDDER END STOPS ____________________________ 11
SETTING THE PORT END STOP ________________________________ 11
SETTING THE STARBOARD END STOP __________________________ 11
SETTING THE MIDSHIPS POSITION _____________________________ 12

SELECTING THE RUDDER DRIVE TYPE _________________________ 13

RUDDER HARD-OVER TIME ___________________________________ 14

BOAT LENGTH ______________________________________________ 16
SETTING IN METRES _________________________________________ 16
SETTING IN FEET ____________________________________________ 16

MAGNETIC DIP ANGLE _______________________________________ 17
MAGNETIC DIP ANGLE COMPENSATION CHART __________________ 17
SETTING THE MAGNETIC DIP VALUE ___________________________ 18

COMPASS ALIGNMENT _______________________________________ 19

VERIFY OPERATION OF RUDDER DRIVE ________________________ 20

COMMISSIONING SEA TRIAL __________________________________ 22

ENGAGING THE AUTOPILOT __________________________________ 23

Advertising