Step 3 – attach the antenna riser to the pedestal, Step 4 – install the 3g cell modem hardware – Baseline Systems BaseStation 3200 in Pedestal User Manual

Page 8

Advertising
background image

Installation and User Guide for Baseline Cell Modems in Pedestal Enclosures

Step 3 – Attach the Antenna Riser to the Pedestal

1. Align the holes at the bottom of the antenna riser

with the holes in the gasket at the mounting

location on the outside left wall of the pedestal.

2. Feed the free end of the antenna cable through

the small hole that you made in the gasket and

into the inside of the pedestal.

3. Working from the outside of the pedestal, insert

the bolts that you removed earlier into the four

holes.

4. Working from the inside of the pedestal, thread

the nuts that you removed earlier onto the four

bolts. Tighten the nuts snugly.

Step 4 – Install the 3G Cell Modem Hardware

IMPORTANT!

The BL-CM3G cell modem hardware is compatible with all BaseStation 1000

controllers in X cabinet and pedestal (P) enclosures. BaseStation 3200 controllers in X and P

enclosures shipped after April 16, 2014 are also compatible. Earlier BaseStation 3200 models

require different 3G cell modem components.

1. We recommend that you back up your current configuration before starting this process in

case you need to restore your system.

Refer to Backing Up the Controller Programming in the BaseStation 1000 User Manual.

Refer to Backing Up Your System in the BaseStation 3200 User Manual.

2. Halt all watering while you install the cell modem hardware.

BaseStation 1000: Press the OFF button.

BaseStation 3200: Turn the dial to the OFF position.

3. Open and remove the front door on the lower part of the pedestal.

Page 4

Advertising
This manual is related to the following products: